Unit 3 update

Unit 3 was synchronized to the Independent Electricity System Operator (IESO) grid Sept. 29 at 10 p.m. The unit was taken offline Aug. 1 for a planned outage to perform pressure tube inspections and selectively defuel several fuel channels inREAD MORE >

Unit 5 update

Unit 5 was returned to service early this morning at 3:33 a.m. following a brief forced outage at the request of Hydro One and the IESO Grid Operator to permit the repair of a Capacitor Voltage Transformer (CVT) in theREAD MORE >

Unit 5 update

Unit 5 was safely removed from service this morning for a brief outage at the request of Hydro One and the IESO Grid Operator to permit the repair of a Capacitor Voltage Transformer (CVT) in the Bruce B switchyard.

Unit 6 update

Unit 6 was safety taken offline and shut down at 9:32 p.m. Friday, Sept. 8 to commence the final planned outage before the four-year Major Component Replacement (MCR) campaign which will begin on Jan. 1, 2020. This is the first time BruceREAD MORE >

Unit 3 update

Bruce Power is investigating the cause of the August 2, 2017, release of heat transport water in a diked area immediately adjacent to the pump inside the Bruce A station. The diked area is designed to collect leakage if itREAD MORE >

Unit 3 update

Earlier today, with Unit 3 in a planned shutdown, crews encountered an issue with a pump as they aligned the unit for an inspection program. As a result, a quantity of water leaked in the area of the pump andREAD MORE >