Project TitleProject NumberProject Phase
BB U05678 Rosemount 1151 Pressure Transmitters39606combo prep/exe
BA Steam & Feedwater Sampling Heat Exchangers – Replace39924prep, exec
BB U0 Emergency Power Generators – Power Turbine Overhauls70080dev
BA U34 Containment Penetrations- Boiler Feedwater Seal Bellows – Replacement39800combo prep/exe
BB U5678 ESC Pumps Motor Replacement39769prep
BA U34 Closed Loop Demineralized Water Pump Motor – Replacement39767prep
BA Moderator HX39597execution
BA Shutdown Cooling Heat Exchangers39635execution
BA U34 End Shield Cooling Pump Motor – Replacement39766prep
BB Vertical In-Core Flux Detectors – SDS1 & RRS39110execution
BB Horizontal Ion Chamber Detectors – SDS239212execution
BB – Closed Loop Demineralized Water Pump Motors39770prep
BB U5678 HPRW Pump Motor Replacement39773combo prep/exe
BA U34 Emergency Coolant Injection (ECI) Check Valve (NV) Interspace Test MVs39602execution
BA F&P and Foxboro PTs Replacement39168execution
U678 Presurized Tanks Replacement39124execution
BA – PHT – Pressurizing Pumps39789execution
39598 : BA U34 Replace DSTs39598execution
BA U034 Rosemount 1151 Pressure Transmitters 39636combo prep/exe
BA – U34 Above-Ground Piping and Pipe Components – Condensate Make-up39998combo prep/exe
BB U5678 CCW Buried Piping Clean, Inspect, & Protect39498combo prep/exe
BB U05678 4.16KV Class III and Class IV Switchgear Bus Refurbishment 39502combo prep/exe
BB 500kV High Voltage Power Cable Replacement39393execution
BA Reactor Area Bridge – Ball Jacks & Ball Screws Replacement39148execution
BB U05678 – 250Vdc BY Bank Replacement39152combo prep/exe
BA U034 EQ Cables – Replace 39595execution
BA Legacy 600V MCC – U0A MCCs-3912839128execution
BA U34 AOV Critical Nuclear Valve Replacement39646execution
39634: BB U5678 Replace UST39634combo prep/exe
BB ECI Motors – Refurbishment Program39605prep
BA U034 Protective Relays39490combo prep/exe
BB Replacement of the FH Computer Multiplexor Boards39812prep, exec
BA Shutoff Rod and Control Absorber Assemblies SDS1 &RRS39637combo prep/exe
BB Shutoff Rod Control & Adjuster Absorber Assemblies SDS1 & RRS39587combo prep/exe
BB U5678 CCW and LPSW Travelling Screens – Basket & Chain Replacement39590combo prep/exe
BA Replacement of the FH Computer Multiplexor Boards39811prep, exec
BA – Replace at Risk Above-Ground Piping and Pipe Components – High Pressure Service Water Piping39776combo prep/exe
39640: BB U05678 CLIII & CLIV Dry Distribution Transformer Replacement 39640combo prep/exe
BA Buried Piping Generator Hydrogen Storage & Transfer System39369combo prep/exe
BA FH Flow Injection Flow Control Valves – Flow injection control valve replace39808def, prep/exec
BB Above-Ground LPSW Piping Replacement39997combo prep/exe
39568: BB U5678 SST (Station Service Transformers)39568combo prep/exe
39504 : BB U5678 Distribution Service Transformers (DST)39504combo prep/exe
BB U5678 HPRW Pumps39656combo prep/exe
BB Above-Ground LPSW Piping Replacement39997combo prep/exe
BA U34 Air Operated Valves39643execution
BA U34 Replace Moderator LPSW TCVs39601execution
BA U34 Guelph (Kerotest/Taylor Forge) Swing Check Valves39603execution
BA – U34 – Replace SDC System MOVs39645execution
39553: BB U5678 PHT Pump Transformer Replacement 39553execution
BB U05678 120 VAC Class II Inverter Replacement39638combo prep/exe
BB Reactivity Deck Cranes Replacement39151execution
BA U34 Legacy 600V Motor Control Centre – Replacement39794execution
BB Horizontal In-Core Flux Detectors – SDS239108execution
BA – Maintenance Cooling System (MCS) Pumps39787combo prep/exe
BA 250 Vdc Switchgear and Buses – Replace39914def
BA U34 Replace DCC Contact Scanners39799combo prep/exe
BA U34 TEHG System & TSI39074combo prep/exe
BB U5678 ESC Pumps Refurbishment39659prep
BB 13.8 kV SST and UST Bus Ducts39677prep, exec
BB U05678 Replace 13.8kV Class III & Class IV Switchgear Buses39503combo prep/exe
BB FMMA Crane – Refurbish FMMA cranes39784prep, exec
BA U0A Above-Ground At Risk Piping Replacement – Domestic Water System39647execution
BA High Pressure Recirc Water Pumps – Replace39771def, prep/exec
BB PHT Pressurizing Pump Motors39381combo prep/exe
BA 13 kV & 4 kV Circuit Breakers – Replace All Med Volt Circ Breakers39222combo prep/exe
BB Feedwater Seal Bellows Replacement39542combo prep/exe
BB Reactor Area Bridge – Ball Jacks & Ball Screws Replacement39117combo prep/exe
BB U5678 Above-Ground At Risk Piping Replacement – LPSW39499combo prep/exe
BB DCC Contact Scanners – Replace DCC Contact Scanners39875def, prep
BB FH Flow Injection Flow Control Valves – Flow injection control valve replace39809def, prep/exec
BA U34 CLDW Pumps Refurbishment39644prep
BB 45 vDC Power Supplies – Update Balance of 45 vDC Power Supplies39391combo prep/exe
BB Condenser Circulating Water (CCW) Pumps39658combo prep/exe
BB Condenser Cooling Water (CCW) System Pump Motors39375combo prep/exe
BB Above-Ground Piping and Pipe Components – Domestic Water Piping – Replace At Risk Piping39819execution
BA U34 IPB Ducts and Cooling Upgrade and Refurbishment39654execution
BB 500kV Synchronizing Circuit Breakers and Cables39511execution
BA U034 Replace Above-Ground Emergency Boiler Cooling Piping39650prep
BA Printed Circuit Card (Boards)-Replace non-EHC cards39907def, prep
BA Replace Conductivity Analyzers39922prep
BA U0A Refurbishment- 13.8 kV Transfer Buses39781combo prep/exe
BB U0B Refurbishment -13.8 kV Transfer Buses39660combo prep/exe
39913 – BA Turbine Lube Oil System – Replace Oil Purifiers/Jacking Oil Pumps39913def, prep
BB Emergency Coolant Inversion (ECI) Pump-Rolling Refurbishment39961def, prep
BB 500kV High Voltage Power Cables39676combo prep/exe
BB Unit 0 SAB Ball Screws and Jacks Replacement39746combo prep/exe
BA Replace PHT Sample Coolers39912def, prep/exec
BB BB PHT Sample Coolers – Replace PHT Sample Coolers39894def, prep/exec
BA Above Ground Piping Condenser Circulating Water System – Replace Piping39777def
BA High Pressure Recirc Water Pump Motors – Refurbish Pump Motors39772def, prep/exec
BB GE WavePro Circuit Breakers70002def, prep/exec
BA Manual Valves – Replace Select & Obsolete Isolators39223combo prep/exe
BB- U5678 Above-Ground Piping and Pipe Components – Condenser Circulating Water Pip – Replace Piping39883prep, exec
BA U34 Buried Piping LPSW System- 30in Discharge Lines70094dev
BB Above-Ground Piping and Pipe Components – Condensate Make-up Piping – Replace At Risk Piping39884def, prep
BB 48 Vdc Converters – 48V Conv – Replacement39885def, prep
BA CDF Racks – Replace CDF racks U0 only39778def, prep
BB AOV Newman Hattersley Bellow Sealed Valves39387combo prep/exe
BB FH BB BB QIA1 Online Analyzer – Replace QIA1 Analyzers39895def, prep
BA – Replace at Risk Above-Ground Piping and Pipe Components – Common Service Water Piping39906def, prep
BA U34 CCW Buried Piping Clean, Inspect, & Protect39775combo prep/exe
Buried Piping for BB Service Air System39977combo prep/exe
BB U5678 PHT Pumps39554combo prep/exe
BA U34 Above-Ground Piping and Piping Replacement – LPSW39653combo prep/exe
BB New Fuel (N/F) Port Valves and Irradiated Fuel (I/F) Port Valves – Replace fuel port valves39807def, prep
BA 4.16 kV Class III and Class IV Switchgear and Buses – Refurbish39908def, prep
BA 13.8 kV Class III and Class IV Switchgear and Buses – Refurbish39909def, prep
BA Generator Stator Winding , Core , Frame – Gen Stator – Current Practice39910combo prep/exe
BB Air Operated Valves – HPSW Control Valves – Replace HPSW valves39797def, prep
BA Trash Racks – Apply anti-fouling coating to trash racks39915def, prep
BB Bruce B Trash Racks – Apply anti-fouling coating to trash racks39801def, prep
BA Bruce A CCW, LPSW and CSW Travelling Screens – Traveling Screens – Upgrade Screens39802def, prep
BB Environmentally Qualified cables – EQ Cables – Replace39793combo prep/exe
BA SIFB Dry Storage Crane – SIFB dry storage crane Mid life controls upgrade39795def, prep
BB SIFB Dry Storage Crane – SIFB dry storage crane Mid life controls upgrade39796def, prep
BA U034 Replace Containment Monitors70005def, prep/exec
BB U5678 Guelph Check Valves39507combo prep/exe
BA U0 AOV Containment Boundary MVs – Replace39364combo prep/exe
BA Horizontal In-Core Flux Detectors – SDS239065combo prep/exe
BA Service Area Bridges – Ball Jacks & Ball Screws Replacement39149combo prep/exe
BA Replace 500kV Disconnect Switches39816combo prep/exe
BB Manual Valves – Replace Select & Obsolete Isolators39214prep, exec
BA – Replace Buried Piping for Bruce A Low Risk Conventional Systems39905prep, exec
BA Buried Piping – Carbon Dioxide System39978def, prep/exec
BB Buried Piping for CO2 System39979def, prep/exec
BA U0 – Above Ground LPSW Piping Replacement39983prep
BA U0 – Above Ground LPSW Piping Replacement39983prep
BB AOV Nuclear Valves39378combo prep/exe
BA Bruce A CCW, LPSW and CSW Travelling Screens – Traveling Screens – Replace Baskets39916def, prep
BA New Fuel (N/F) Port Valves and Irradiated Fuel (I/F) Port Valves – Replace fuel port valves39806def, prep
BB – PHT Pressurizing Pumps – Inspect and Overhaul39888def, prep/exec
BA U34 DCC Replacement39604combo prep/exe
BB U58 DCC Replacement39073combo prep/exe
39632: BB U5678 Replace Main Output Transformers39632combo prep/exe
BA: U34 Steam and Feedwater Sampling Hydrazine Analyzer (AMOT-0508-02)39923def, prep
BA Steam & Feedwater Sampling Sodium Analyzers – Replace Sodium Analyzers39925def, prep
BA Replace MCR Chilled Water Ventilation Units39927def, prep
BA Replace MCR/CER Emergency ACUs39928def, prep
BB ACUs – Main Control Room HVAC – Replace MCR Chilled Water Ventilation Units (AMOT 538-3)39897def, prep
BB – Replace DCC Display Systems39864prep, exec
BA High Pressure (HP) Turbine – Complete HP Replacement39785def, prep
BA Turbine Control Valves – Replace Degraded Components39786def, prep
BA Primary Heat Transport (PHT) Pumps – Overhaul Pumps and Replace Impellers39788combo prep/exe
BA U0 Above Ground Piping Replacement – Fire Water System39648combo prep/exe
BB Buried Piping for Low Pressure Service Water System – Replace Piping70226dev
BB Buried Piping LPSW – Replace Remaining 70227dev
BA – U0 Above-Ground Piping and Pipe Components – Condensate Make-up39999def, prep
BA Water Treatment Plant – Custom Retrofit of the Existing NWTP70123dev
BB FH BB Fire Detection Data Gathering Panels – Fire Detection Panels – Replace Pyrotronics39899def, prep
BA End Shield Cooling Pumps – Refurbish ESC Pumps39930def, prep
BB Air Operated Valve – Auxiliary Pressure Relief Valve (APRV) actuator replacement – 3979839798def, prep/exec
BA U34 Process Control Devices in Condensate/Boiler Feed Systems39591combo prep/exe
BA Fixed Area Gamma Monitors – Replace remaining subset39921prep, exec
BB Buried Piping for Domestic Water System39981execution
39890 – BB Bruce B Excitation System – Gen Excitation – Replace39890def, prep
39892 – BB Turbine Turning Gear – Replace Assembly39892def, prep
BB U5678 LPSW Pumps – Inspect/Overhaul39505execution
BB LPSW System Pump Motors39390execution
BB Vault Cranes – Vault Crane – Midlife Controls Upgrade39887def, prep
BA HP Feedwater Heaters – Shell Repairs39929prep, exec
BA – Emergency Cooling Injection (ECI) Pump-Rolling Refurbishment39960def, prep/exec
BB Protective Relaying39489combo prep/exe
BB 550kV Disconnect Switches & Associated Equipment39512combo prep/exe
BB U5-8 EHG System & TSI Replacement39069combo prep/exe
BA – Replace Buried Piping for Bruce A Fire Water (FW) System39904def, prep/exec
BA Replacement of QPS Control System – Standby Diesel Generators (SDG1 and SDG2) – Replacement39918def, prep
BB Above-Ground Piping and Pipe Components – Common Service Water Piping – Replace At Risk Piping39881def, prep/exec
BB Guelph Swing Check Valves, Main Steam Poison Prevent – Replace and maintain poison prevent NVs39889def, prep
BB U5678 IPB Ducts and Cooling Upgrade and Refurbishment39501combo prep/exe
BB Replace HP Turbine on 4 Units39791def, prep
BB – Air Operatated Valve – Liquid Zone Control CVs-Replace Valve/Actuator Assembly70001def, prep
BB – U5678 Above-Ground Piping and Pipe Components – Emergency Water System Piping – Replace Piping39880def, prep/exec
BA U34 Replace RRS In-Core Flux Detectors70007execution
BB DN Monitoring Control Equipment – DN Monitoring – Partial Replacement of Control Systeme39896def
BB CSW Buried Piping – Replacement39931def, prep
BB Buried Piping for Bruce B Emergency Water Supply (EWS) System – Replace Piping39876def, prep
BB Buried Piping for Bruce B Fire Water (FW) System – Replace Piping39879def, prep
BB Above-Ground Piping and Pipe Components – Fire Protection Piping – Replace at risk fire piping39818def, prep
BB Above-Ground Piping and Pipe Components – Vacuum Priming Piping – Replace At Risk Piping39821def, prep
BA 600 Vac Class II Inverters – 600V Cl2 INV – Replacement39901def, prep
BB 600 Vac Class II Inverters – 600V Cl2 INV – Replacement39886def, prep
BA – Replace Buried Piping for Bruce A Lubricating Oil Storage & Transfer System39903def, prep
Closed Loop Demin Swing Check Valves (AMOT-0306-02)39790def, prep
BA Civil Structures – Concrete at PHT Pump Bowls – Restore Cooling39803prep, exec
BA Qualified Power Supply (QPS) Standby Diesel Generators (SDG1&SDG2) (AMOT-0422-02)39917def
BA Qualified Power Supply (QPS) Fuel Storage system (TK1 & TK3) – Replacement39919def
BB Above-Ground Piping and Pipe Components – High Pressure Service Water Piping – Replace Piping39882def, prep/exec
BA Gas Chromatograph – Replace Analyzer and Sample Conditioning Panel39920def, prep
BA DN Monitoring Control Equipment – Partial Replacement of Control System39926def, prep
BB : Power Conversion Room ACUs39898def, prep
BB Domestic Water Buried Piping Rehabilitation39980def, prep
BB – U0B Above-Ground Piping and Pipe Components – Emergency Water System Piping – Replace Piping39820def, prep/exec
BB Buried Piping for Bruce B Lubricating Oil Storage & Transfer System – Replace Piping39878def/comon prep
BB : Buried Piping for BB Spent Resin Storage and Transfer system39877prep, exec
BA – Replace Buried Piping for Spent Resin Storage and Transfer System39902prep, exec
BB U0B Buried Piping for EWS Inspections39630execution
BA Buried Piping – Fire Water – Replace ring header piping North of Unit 3&470229dev
BA Vertical In-Core Flux Detectors- SDS1 & RRS – Replace Vertical SDS1 ICFD70243dev
BA Turbine Gland Steam System – Replace Major ComponentsN/Adev
BA QIA1 Online Analyzer70240dev
BA Buried Piping for Common Water System Replace70327dev
BB Low Voltage Power Cables – Replace high risk low voltage cablesN/Adev
BB Shutdown Cooling Heat Exchangers Replace70236dev
BA Bleed Condenser Swap out inspections of Bleed Condenser tubes70235dev
BA Moderator HX Waste Costs70246dev
BB Moderator HX Replace70234dev
BA U0 Steam Traps – ReplaceN/Adev
BB U0 Steam Traps – ReplaceN/Adev
BA Steam & Feedwater Sampling Oxygen Analyzers70239dev
BA Horizontal Ion Chamber Amplifiers- SDS2 – Replace Horizontal Ion Chamber amplifiers70328dev
BA Horizontal Ion Chamber Detectors- SDS2 – Replace Ion chamber detectors70331dev
BB Steam & Feedwater Sampling Sodium Analyzers70241dev
BB 250 Vdc Rectifiers and 48 Vdc Test Rectifiers Replace70351dev
BA Above-Ground Piping and Pipe Components – Closed Loop Demineralized Water Piping70237dev
BB HP Feedwater Heaters – Perform Shell Repairs70242dev
BA U034 Fischer & Porter Controllers Replace 4 NPC APRV ControllersN/Adev
Calandria Relief Ducts – Decommission & Replace70326Initiation
BB Maintenance Cooling System (MCS) Pumps Inspect and Overhaul70329dev
BA Generator Stator Cooling System – Replace Major ComponentsTBDdev
BA Guelph (U3 & 4) Swing Check Valves Main Steam Poison Prevent70350dev
BB Generator Stator Windings – Rewind70353dev
BB Moderator Cover Gas compressors Reverse Engineer spare MCG partsTBDdev
BB Turbine Lube Oil – Replace Major Components70352dev
BB Turbine Gland Steam – Replace Major ComponentsN/Adev
70247 – BB Replace Generator Hydrogen Coolers70247dev
BB Turb Exhaust Cool – Replace Major ComponentsN/Adev
BB 600 Vac Switchgear Buses (Unit 0B) – Refurb70244dev
BB 600 Vac Switchgear Buses (Units 5/6/7/8) – Refurb70245dev
BB Turbine FRF – Replace Major Components70348dev
BA Generator Seal Oil System – Replace Major ComponentsTBDdev
BB Shut Down Cooling (SDC) Pumps Inspect and OverhaulTBDdev
BB Gen Stator Cooling – Replace Major Components70330dev
DN Monitoring – Replace WaterboxesTBDdev
BA U34 Buried Piping for Low Pressure Service Water System Replace70233dev
BB Closed Loop Demin Water Pumps – ReplaceTBDdev
BA Low Pressure Service Water (LPSW) Pumps Refurbishment Program70238dev

#NuclearAgainstRacism

We stand in solidarity with Black, Indigenous and People of Colour communities across the world in the unquestionable proclamation that their lives matter.

Stay in touch

Sign up for our monthly eNewsletter

The shortcode with the name issuu-popup dose not exist.