LAMP4 Project Summary

Legend

Phase Phase Description
DEV Development/Conceptual
DEF Definition/Preliminary
PREP Preparation/Detailed Engineering
EXEC Execution

LAMP4 (2025-2027)

As of April 1, 2023

Project TitleProject NumberProject Phase
BB U05678 Rosemount 1151 Pressure Transmitters39606combo prep/exe
BA Steam & Feedwater Sampling Heat Exchangers – Replace39924prep, exec
BB U0 Emergency Power Generators – Power Turbine Overhauls70080dev
BA U34 Containment Penetrations- Boiler Feedwater Seal Bellows – Replacement39800combo prep/exe
BB U5678 ESC Pumps Motor Replacement39769prep
BA U34 Closed Loop Demineralized Water Pump Motor – Replacement39767prep
BA Moderator HX39597execution
BA Shutdown Cooling Heat Exchangers39635execution
BA U34 End Shield Cooling Pump Motor – Replacement39766prep
BB Vertical In-Core Flux Detectors – SDS1 & RRS39110execution
BB Horizontal Ion Chamber Detectors – SDS239212execution
BB – Closed Loop Demineralized Water Pump Motors39770prep
BB U5678 HPRW Pump Motor Replacement39773combo prep/exe
BA U34 Emergency Coolant Injection (ECI) Check Valve (NV) Interspace Test MVs39602execution
BA F&P and Foxboro PTs Replacement39168execution
U678 Presurized Tanks Replacement39124execution
BA – PHT – Pressurizing Pumps39789execution
39598 : BA U34 Replace DSTs39598execution
BA U034 Rosemount 1151 Pressure Transmitters 39636combo prep/exe
BA – U34 Above-Ground Piping and Pipe Components – Condensate Make-up39998combo prep/exe
BB U5678 CCW Buried Piping Clean, Inspect, & Protect39498combo prep/exe
BB U05678 4.16KV Class III and Class IV Switchgear Bus Refurbishment 39502combo prep/exe
BB 500kV High Voltage Power Cable Replacement39393execution
BA Reactor Area Bridge – Ball Jacks & Ball Screws Replacement39148execution
BB U05678 – 250Vdc BY Bank Replacement39152combo prep/exe
BA U034 EQ Cables – Replace 39595execution
BA Legacy 600V MCC – U0A MCCs-3912839128execution
BA U34 AOV Critical Nuclear Valve Replacement39646execution
39634: BB U5678 Replace UST39634combo prep/exe
BB ECI Motors – Refurbishment Program39605prep
BA U034 Protective Relays39490combo prep/exe
BB Replacement of the FH Computer Multiplexor Boards39812prep, exec
BA Shutoff Rod and Control Absorber Assemblies SDS1 &RRS39637combo prep/exe
BB Shutoff Rod Control & Adjuster Absorber Assemblies SDS1 & RRS39587combo prep/exe
BB U5678 CCW and LPSW Travelling Screens – Basket & Chain Replacement39590combo prep/exe
BA Replacement of the FH Computer Multiplexor Boards39811prep, exec
BA – Replace at Risk Above-Ground Piping and Pipe Components – High Pressure Service Water Piping39776combo prep/exe
39640: BB U05678 CLIII & CLIV Dry Distribution Transformer Replacement 39640combo prep/exe
BA Buried Piping Generator Hydrogen Storage & Transfer System39369combo prep/exe
BA FH Flow Injection Flow Control Valves – Flow injection control valve replace39808def, prep/exec
BB Above-Ground LPSW Piping Replacement39997combo prep/exe
39568: BB U5678 SST (Station Service Transformers)39568combo prep/exe
39504 : BB U5678 Distribution Service Transformers (DST)39504combo prep/exe
BB U5678 HPRW Pumps39656combo prep/exe
BB Above-Ground LPSW Piping Replacement39997combo prep/exe
BA U34 Air Operated Valves39643execution
BA U34 Replace Moderator LPSW TCVs39601execution
BA U34 Guelph (Kerotest/Taylor Forge) Swing Check Valves39603execution
BA – U34 – Replace SDC System MOVs39645execution
39553: BB U5678 PHT Pump Transformer Replacement 39553execution
BB U05678 120 VAC Class II Inverter Replacement39638combo prep/exe
BB Reactivity Deck Cranes Replacement39151execution
BA U34 Legacy 600V Motor Control Centre – Replacement39794execution
BB Horizontal In-Core Flux Detectors – SDS239108execution
BA – Maintenance Cooling System (MCS) Pumps39787combo prep/exe
BA 250 Vdc Switchgear and Buses – Replace39914def
BA U34 Replace DCC Contact Scanners39799combo prep/exe
BA U34 TEHG System & TSI39074combo prep/exe
BB U5678 ESC Pumps Refurbishment39659prep
BB 13.8 kV SST and UST Bus Ducts39677prep, exec
BB U05678 Replace 13.8kV Class III & Class IV Switchgear Buses39503combo prep/exe
BB FMMA Crane – Refurbish FMMA cranes39784prep, exec
BA U0A Above-Ground At Risk Piping Replacement – Domestic Water System39647execution
BA High Pressure Recirc Water Pumps – Replace39771def, prep/exec
BB PHT Pressurizing Pump Motors39381combo prep/exe
BA 13 kV & 4 kV Circuit Breakers – Replace All Med Volt Circ Breakers39222combo prep/exe
BB Feedwater Seal Bellows Replacement39542combo prep/exe
BB Reactor Area Bridge – Ball Jacks & Ball Screws Replacement39117combo prep/exe
BB U5678 Above-Ground At Risk Piping Replacement – LPSW39499combo prep/exe
BB DCC Contact Scanners – Replace DCC Contact Scanners39875def, prep
BB FH Flow Injection Flow Control Valves – Flow injection control valve replace39809def, prep/exec
BA U34 CLDW Pumps Refurbishment39644prep
BB 45 vDC Power Supplies – Update Balance of 45 vDC Power Supplies39391combo prep/exe
BB Condenser Circulating Water (CCW) Pumps39658combo prep/exe
BB Condenser Cooling Water (CCW) System Pump Motors39375combo prep/exe
BB Above-Ground Piping and Pipe Components – Domestic Water Piping – Replace At Risk Piping39819execution
BA U34 IPB Ducts and Cooling Upgrade and Refurbishment39654execution
BB 500kV Synchronizing Circuit Breakers and Cables39511execution
BA U034 Replace Above-Ground Emergency Boiler Cooling Piping39650prep
BA Printed Circuit Card (Boards)-Replace non-EHC cards39907def, prep
BA Replace Conductivity Analyzers39922prep
BA U0A Refurbishment- 13.8 kV Transfer Buses39781combo prep/exe
BB U0B Refurbishment -13.8 kV Transfer Buses39660combo prep/exe
39913 – BA Turbine Lube Oil System – Replace Oil Purifiers/Jacking Oil Pumps39913def, prep
BB Emergency Coolant Inversion (ECI) Pump-Rolling Refurbishment39961def, prep
BB 500kV High Voltage Power Cables39676combo prep/exe
BB Unit 0 SAB Ball Screws and Jacks Replacement39746combo prep/exe
BA Replace PHT Sample Coolers39912def, prep/exec
BB BB PHT Sample Coolers – Replace PHT Sample Coolers39894def, prep/exec
BA Above Ground Piping Condenser Circulating Water System – Replace Piping39777def
BA High Pressure Recirc Water Pump Motors – Refurbish Pump Motors39772def, prep/exec
BB GE WavePro Circuit Breakers70002def, prep/exec
BA Manual Valves – Replace Select & Obsolete Isolators39223combo prep/exe
BB- U5678 Above-Ground Piping and Pipe Components – Condenser Circulating Water Pip – Replace Piping39883prep, exec
BA U34 Buried Piping LPSW System- 30in Discharge Lines70094dev
BB Above-Ground Piping and Pipe Components – Condensate Make-up Piping – Replace At Risk Piping39884def, prep
BB 48 Vdc Converters – 48V Conv – Replacement39885def, prep
BA CDF Racks – Replace CDF racks U0 only39778def, prep
BB AOV Newman Hattersley Bellow Sealed Valves39387combo prep/exe
BB FH BB BB QIA1 Online Analyzer – Replace QIA1 Analyzers39895def, prep
BA – Replace at Risk Above-Ground Piping and Pipe Components – Common Service Water Piping39906def, prep
BA U34 CCW Buried Piping Clean, Inspect, & Protect39775combo prep/exe
Buried Piping for BB Service Air System39977combo prep/exe
BB U5678 PHT Pumps39554combo prep/exe
BA U34 Above-Ground Piping and Piping Replacement – LPSW39653combo prep/exe
BB New Fuel (N/F) Port Valves and Irradiated Fuel (I/F) Port Valves – Replace fuel port valves39807def, prep
BA 4.16 kV Class III and Class IV Switchgear and Buses – Refurbish39908def, prep
BA 13.8 kV Class III and Class IV Switchgear and Buses – Refurbish39909def, prep
BA Generator Stator Winding , Core , Frame – Gen Stator – Current Practice39910combo prep/exe
BB Air Operated Valves – HPSW Control Valves – Replace HPSW valves39797def, prep
BA Trash Racks – Apply anti-fouling coating to trash racks39915def, prep
BB Bruce B Trash Racks – Apply anti-fouling coating to trash racks39801def, prep
BA Bruce A CCW, LPSW and CSW Travelling Screens – Traveling Screens – Upgrade Screens39802def, prep
BB Environmentally Qualified cables – EQ Cables – Replace39793combo prep/exe
BA SIFB Dry Storage Crane – SIFB dry storage crane Mid life controls upgrade39795def, prep
BB SIFB Dry Storage Crane – SIFB dry storage crane Mid life controls upgrade39796def, prep
BA U034 Replace Containment Monitors70005def, prep/exec
BB U5678 Guelph Check Valves39507combo prep/exe
BA U0 AOV Containment Boundary MVs – Replace39364combo prep/exe
BA Horizontal In-Core Flux Detectors – SDS239065combo prep/exe
BA Service Area Bridges – Ball Jacks & Ball Screws Replacement39149combo prep/exe
BA Replace 500kV Disconnect Switches39816combo prep/exe
BB Manual Valves – Replace Select & Obsolete Isolators39214prep, exec
BA – Replace Buried Piping for Bruce A Low Risk Conventional Systems39905prep, exec
BA Buried Piping – Carbon Dioxide System39978def, prep/exec
BB Buried Piping for CO2 System39979def, prep/exec
BA U0 – Above Ground LPSW Piping Replacement39983prep
BA U0 – Above Ground LPSW Piping Replacement39983prep
BB AOV Nuclear Valves39378combo prep/exe
BA Bruce A CCW, LPSW and CSW Travelling Screens – Traveling Screens – Replace Baskets39916def, prep
BA New Fuel (N/F) Port Valves and Irradiated Fuel (I/F) Port Valves – Replace fuel port valves39806def, prep
BB – PHT Pressurizing Pumps – Inspect and Overhaul39888def, prep/exec
BA U34 DCC Replacement39604combo prep/exe
BB U58 DCC Replacement39073combo prep/exe
39632: BB U5678 Replace Main Output Transformers39632combo prep/exe
BA: U34 Steam and Feedwater Sampling Hydrazine Analyzer (AMOT-0508-02)39923def, prep
BA Steam & Feedwater Sampling Sodium Analyzers – Replace Sodium Analyzers39925def, prep
BA Replace MCR Chilled Water Ventilation Units39927def, prep
BA Replace MCR/CER Emergency ACUs39928def, prep
BB ACUs – Main Control Room HVAC – Replace MCR Chilled Water Ventilation Units (AMOT 538-3)39897def, prep
BB – Replace DCC Display Systems39864prep, exec
BA High Pressure (HP) Turbine – Complete HP Replacement39785def, prep
BA Turbine Control Valves – Replace Degraded Components39786def, prep
BA Primary Heat Transport (PHT) Pumps – Overhaul Pumps and Replace Impellers39788combo prep/exe
BA U0 Above Ground Piping Replacement – Fire Water System39648combo prep/exe
BB Buried Piping for Low Pressure Service Water System – Replace Piping70226dev
BB Buried Piping LPSW – Replace Remaining 70227dev
BA – U0 Above-Ground Piping and Pipe Components – Condensate Make-up39999def, prep
BA Water Treatment Plant – Custom Retrofit of the Existing NWTP70123dev
BB FH BB Fire Detection Data Gathering Panels – Fire Detection Panels – Replace Pyrotronics39899def, prep
BA End Shield Cooling Pumps – Refurbish ESC Pumps39930def, prep
BB Air Operated Valve – Auxiliary Pressure Relief Valve (APRV) actuator replacement – 3979839798def, prep/exec
BA U34 Process Control Devices in Condensate/Boiler Feed Systems39591combo prep/exe
BA Fixed Area Gamma Monitors – Replace remaining subset39921prep, exec
BB Buried Piping for Domestic Water System39981execution
39890 – BB Bruce B Excitation System – Gen Excitation – Replace39890def, prep
39892 – BB Turbine Turning Gear – Replace Assembly39892def, prep
BB U5678 LPSW Pumps – Inspect/Overhaul39505execution
BB LPSW System Pump Motors39390execution
BB Vault Cranes – Vault Crane – Midlife Controls Upgrade39887def, prep
BA HP Feedwater Heaters – Shell Repairs39929prep, exec
BA – Emergency Cooling Injection (ECI) Pump-Rolling Refurbishment39960def, prep/exec
BB Protective Relaying39489combo prep/exe
BB 550kV Disconnect Switches & Associated Equipment39512combo prep/exe
BB U5-8 EHG System & TSI Replacement39069combo prep/exe
BA – Replace Buried Piping for Bruce A Fire Water (FW) System39904def, prep/exec
BA Replacement of QPS Control System – Standby Diesel Generators (SDG1 and SDG2) – Replacement39918def, prep
BB Above-Ground Piping and Pipe Components – Common Service Water Piping – Replace At Risk Piping39881def, prep/exec
BB Guelph Swing Check Valves, Main Steam Poison Prevent – Replace and maintain poison prevent NVs39889def, prep
BB U5678 IPB Ducts and Cooling Upgrade and Refurbishment39501combo prep/exe
BB Replace HP Turbine on 4 Units39791def, prep
BB – Air Operatated Valve – Liquid Zone Control CVs-Replace Valve/Actuator Assembly70001def, prep
BB – U5678 Above-Ground Piping and Pipe Components – Emergency Water System Piping – Replace Piping39880def, prep/exec
BA U34 Replace RRS In-Core Flux Detectors70007execution
BB DN Monitoring Control Equipment – DN Monitoring – Partial Replacement of Control Systeme39896def
BB CSW Buried Piping – Replacement39931def, prep
BB Buried Piping for Bruce B Emergency Water Supply (EWS) System – Replace Piping39876def, prep
BB Buried Piping for Bruce B Fire Water (FW) System – Replace Piping39879def, prep
BB Above-Ground Piping and Pipe Components – Fire Protection Piping – Replace at risk fire piping39818def, prep
BB Above-Ground Piping and Pipe Components – Vacuum Priming Piping – Replace At Risk Piping39821def, prep
BA 600 Vac Class II Inverters – 600V Cl2 INV – Replacement39901def, prep
BB 600 Vac Class II Inverters – 600V Cl2 INV – Replacement39886def, prep
BA – Replace Buried Piping for Bruce A Lubricating Oil Storage & Transfer System39903def, prep
Closed Loop Demin Swing Check Valves (AMOT-0306-02)39790def, prep
BA Civil Structures – Concrete at PHT Pump Bowls – Restore Cooling39803prep, exec
BA Qualified Power Supply (QPS) Standby Diesel Generators (SDG1&SDG2) (AMOT-0422-02)39917def
BA Qualified Power Supply (QPS) Fuel Storage system (TK1 & TK3) – Replacement39919def
BB Above-Ground Piping and Pipe Components – High Pressure Service Water Piping – Replace Piping39882def, prep/exec
BA Gas Chromatograph – Replace Analyzer and Sample Conditioning Panel39920def, prep
BA DN Monitoring Control Equipment – Partial Replacement of Control System39926def, prep
BB : Power Conversion Room ACUs39898def, prep
BB Domestic Water Buried Piping Rehabilitation39980def, prep
BB – U0B Above-Ground Piping and Pipe Components – Emergency Water System Piping – Replace Piping39820def, prep/exec
BB Buried Piping for Bruce B Lubricating Oil Storage & Transfer System – Replace Piping39878def/comon prep
BB : Buried Piping for BB Spent Resin Storage and Transfer system39877prep, exec
BA – Replace Buried Piping for Spent Resin Storage and Transfer System39902prep, exec
BB U0B Buried Piping for EWS Inspections39630execution
BA Buried Piping – Fire Water – Replace ring header piping North of Unit 3&470229dev
BA Vertical In-Core Flux Detectors- SDS1 & RRS – Replace Vertical SDS1 ICFD70243dev
BA Turbine Gland Steam System – Replace Major ComponentsN/Adev
BA QIA1 Online Analyzer70240dev
BA Buried Piping for Common Water System Replace70327dev
BB Low Voltage Power Cables – Replace high risk low voltage cablesN/Adev
BB Shutdown Cooling Heat Exchangers Replace70236dev
BA Bleed Condenser Swap out inspections of Bleed Condenser tubes70235dev
BA Moderator HX Waste Costs70246dev
BB Moderator HX Replace70234dev
BA U0 Steam Traps – ReplaceN/Adev
BB U0 Steam Traps – ReplaceN/Adev
BA Steam & Feedwater Sampling Oxygen Analyzers70239dev
BA Horizontal Ion Chamber Amplifiers- SDS2 – Replace Horizontal Ion Chamber amplifiers70328dev
BA Horizontal Ion Chamber Detectors- SDS2 – Replace Ion chamber detectors70331dev
BB Steam & Feedwater Sampling Sodium Analyzers70241dev
BB 250 Vdc Rectifiers and 48 Vdc Test Rectifiers Replace70351dev
BA Above-Ground Piping and Pipe Components – Closed Loop Demineralized Water Piping70237dev
BB HP Feedwater Heaters – Perform Shell Repairs70242dev
BA U034 Fischer & Porter Controllers Replace 4 NPC APRV ControllersN/Adev
Calandria Relief Ducts – Decommission & Replace70326Initiation
BB Maintenance Cooling System (MCS) Pumps Inspect and Overhaul70329dev
BA Generator Stator Cooling System – Replace Major ComponentsTBDdev
BA Guelph (U3 & 4) Swing Check Valves Main Steam Poison Prevent70350dev
BB Generator Stator Windings – Rewind70353dev
BB Moderator Cover Gas compressors Reverse Engineer spare MCG partsTBDdev
BB Turbine Lube Oil – Replace Major Components70352dev
BB Turbine Gland Steam – Replace Major ComponentsN/Adev
70247 – BB Replace Generator Hydrogen Coolers70247dev
BB Turb Exhaust Cool – Replace Major ComponentsN/Adev
BB 600 Vac Switchgear Buses (Unit 0B) – Refurb70244dev
BB 600 Vac Switchgear Buses (Units 5/6/7/8) – Refurb70245dev
BB Turbine FRF – Replace Major Components70348dev
BA Generator Seal Oil System – Replace Major ComponentsTBDdev
BB Shut Down Cooling (SDC) Pumps Inspect and OverhaulTBDdev
BB Gen Stator Cooling – Replace Major Components70330dev
DN Monitoring – Replace WaterboxesTBDdev
BA U34 Buried Piping for Low Pressure Service Water System Replace70233dev
BB Closed Loop Demin Water Pumps – ReplaceTBDdev
BA Low Pressure Service Water (LPSW) Pumps Refurbishment Program70238dev