Power Reactor Operating Licence

Application for Amendment

Bruce Power has applied for an amendment to the Power Reactor Operating Licence PROL 18.01/2028, pursuant to the Nuclear Safety and Control Act, Section 24(2), and the General Nuclear Safety and Control Regulations, Section 6.

The application for the amendment can be read here

The Notice of Intent to Amend the Power Reactor Operating Licence can be read here.

 

2024 Bruce A and Bruce B Probabilistic Safety Assessments – Summary of Methodology and Results

This document is to summarize the methodology and results of the 2024 Probabilistic Safety Assessment (PSA) which provides a comprehensive and integrated assessment of the risks at the Bruce A and Bruce B stations. The PSA is prepared to comply with Bruce Power’s internal risk management governance and CNSC Regulatory Document RD-2.4.2. This document summarizes the results of the PSA for public disclosure.

Public Disclosure PSA Report – 2024